Vetren Energy were asked to design and install a Solar PV system in line with the available system allowance on the network.
After the initial design process, the DNO (Distribution Network Operator) confirmed an 6Kw installation.
The main Solar PV was installed on the new barn and distributed back 125m to the main dwellings providing much needed energy reduction.
©Copyright. All rights reserved.
We need your consent to load the translations
We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.