Vetren Energy were asked to design a solar PV system in line with available roof space and DNO (Distribution Network Operator) allowance.
As the farm has only a single-phase supply, we were only allowed to install a maximum 9Kw of inverter (G100).
Ensuring the most optimum roof available in line with daily solar coverage and space Vetren were able to successfully install a 10Kw array.
The farm can now benefit from reducing their annual usage by up to 50%