Vetren Energy were brought in to repair an existing installation that had been installed under no MCS approval.
The roof was showing signs of poor installation in the form of damaged tiles and incorrect fitting.
The team removed and repaired all the panels and re-installed new rails and fitting kits to ensure the roof was correctly installed under the MCS guidelines.
A full EICR (Electrical Inspection Report) was carried out repairing replacing as and where needed.